Portfolio

Description.

High School auditorium looking at the stage during an assembly

Celebrating the Arts

Following DRAW Collective’s feasibility study for Norwin School District, the District and the DRAW Collective team began the design and plans for the high school’s new Performing Arts Center. The Norwin Performing Arts Center is a renovated space that not only improves the performers’ experience with professional lighting and sound systems, but also the audience […]

Celebrating the Arts Read More »

Revitalized Educational Spaces

School districts, such as the Grove City Area School District, are actively investing in their students and their learning experience – and the results are telling. The District and DRAW Collective are collaborating on the renovations of the current high school to reimagine their arts, fitness, science, and learning spaces. Extensive infrastructure improvements, along with

Revitalized Educational Spaces Read More »

Nourishing Education

To help Beaver County citizens access fresh food and support local farmers, DRAW Collective partnered with Crop & Kettle and RiverWise to design concepts for a new Food & Energy Hub in Ambridge, PA. Together, the team organized the building into three main areas: a teaching kitchen for entrepreneurial programs, a market district anchored by

Nourishing Education Read More »

Student-First Design

Quality early childhood education shapes how students function socially and intellectually for the rest of their lives. With this in mind, DRAW designed the new South Fayette Township K–2 Elementary School to support students’ natural behaviors, curiosity, and needs while also giving teachers and staff the tools to deliver high-quality instruction. To advance the District’s

Student-First Design Read More »

Designing for Student Engagement

DRAW designed the expansion and renovation of Knoch School District High School to feature a bright, distinct new entrance. As part of the addition, the team created a large, multipurpose student commons with collaborative learning areas and cafeteria seating after relocating the original cafeteria. In addition, DRAW added new technology education classrooms equipped with proper

Designing for Student Engagement Read More »

Next Generation Community Recreation

DRAW Collective provided Architectural Services for the Municipality of Mt. Lebanon’s Parks Master Plan and Recreation Center project, working in conjunction with Pashek + MTR. Pashek led the Master Plan process to develop recommendations that address the current and future recreation and park needs of the Municipality’s residents. As part of this effort, DRAW led

Next Generation Community Recreation Read More »

Accessible & Inclusive Hub

DRAW Collective is working with Mt. Lebanon Public Library on a master plan to evaluate the existing facility. The master plan explores how upgrades can modernize the interiors, provide wayfinding, and increase access to their outdoor garden. The Library identified problem areas such as how the space will evolve and how a redesign can maximize

Accessible & Inclusive Hub Read More »

AHN Forbes Hospital Lobby

Hospital Lobby Revisioned

Allegheny Health Network (AHN) sought to create a safer, more inviting lobby on the second floor of Forbes Hospital. At the same time, AHN wanted to incorporate its new branding standards to align with those of its other locations. Consequently, the design needed to provide a functional yet warm environment for the visitors and staff

Hospital Lobby Revisioned Read More »

Integrating Creativity

DRAW is partnering with the South Fayette Township School District to design strategic additions and upgrades to the Intermediate School that address growing enrollment and evolving educational needs. The school’s original design anticipated future expansion, allowing the new additions to integrate seamlessly into the existing building. The project includes a new three-story classroom wing, a

Integrating Creativity Read More »

Supporting Diverse Learning

The Mars Area School District has undertaken a comprehensive district feasibility study focused on its elementary schools and grade-level groupings. As part of the first phase of this initiative, the District is converting Mars Area Elementary School into a PK–3 facility. To accommodate the relocation of Kindergarten and 1st-grade students, the team is constructing a

Supporting Diverse Learning Read More »

Scroll to Top