Athletics & Wellness

Stadium Built for Victory

Planning for Norwin School District’s new Knights Stadium began after DRAW Collective completed a comprehensive feasibility study for the District. The current stadium, originally built in 1965, has undergone renovations over the years. Now, with the stadium’s increasing WPIAL demand, the District collaborated with DRAW Collective to construct a new stadium in late 2025 with […]

Stadium Built for Victory Read More »

Next Generation Community Recreation

DRAW Collective provided Architectural Services for the Municipality of Mt. Lebanon’s Parks Master Plan and Recreation Center project working in conjunction with Pashek + MTR. Pashek led the Master Plan to prepare recommendations for meeting the current and future recreation and park needs of the Municipality’s residents while DRAW led the Recreation Center building evaluation

Next Generation Community Recreation Read More »

Trinity Area School District Indoor Athletic Facility

State-of-the-Art Indoor Athletic Hub

The Trinity Area School District’s 26,300 SF new multi-purpose athletic facility includes a large Health & Wellness Training Center with an indoor turf practice facility to support the District’s Athletic Stadium. The indoor turf field is used by multiple athletic teams for year-round practices. The field surface was selected to be playable for football, soccer,

State-of-the-Art Indoor Athletic Hub Read More »

A Rocking New Field

With softball growing in popularity, paired with the growing demand for turf fields in the and the local need for complexes to host events and tournaments, the University determined that upgrades were a priority as well as to make the facility accessible for all who attend a game. After reviewing several options from the study,

A Rocking New Field Read More »

Go Knoch Knights!

In addition to the work completed at Knoch School District’s High School, DRAW Collective collaborated with the District to upgrade the school’s adjacent athletic facilities. The Stadium athletic improvements include a new multi-sport synthetic turf field, new relocated jumping events, and track resurfacing.  In addition, the stadium entry plaza, gates, and fencing were reconfigured to

Go Knoch Knights! Read More »

New Athletic Facility

Mars Area School District has invested in the improvement of its athletic facilities with the construction of five new tennis courts at Mars Area High School. The project includes the installation of a multi-court complex designed to support both physical education programs and interscholastic athletics. The District hired DRAW Collective and H.F. Lenz Company to

New Athletic Facility Read More »

Multi-Sport Facilities

DRAW Collective has worked with the School District on a number of athletics projects over the years. Initially, DRAW Collective designed a fan-friendly new stadium facility that included a gateway entrance, a concession stand, and a press box with a banquet room located within the box. Later, DRAW Collective assisted the Pine-Richland School District with

Multi-Sport Facilities Read More »

Talbots Athletics

DRAW Collective conducted a District-wide facility study for the Hampton Township School District that examined solutions for improvements to the High School’s aging athletic facilities. As a result, DRAW Collective worked with the District to replace a number of features at Hampton High School’s Fridley Field. The rubber track was replaced and painted, and the

Talbots Athletics Read More »

Fieldhouse Built for Teamwork

DRAW has a long history with Waynesburg University including multiple projects at their stadium and in support of their Division III Football, Soccer and Lacrosse teams.DRAW designed the original Fieldhouse at the southern end of the stadium to house locker rooms for the Football, Soccer, and Lacrosse teams along with training facilities to support student

Fieldhouse Built for Teamwork Read More »

Scroll to Top